Announcement

Collapse
No announcement yet.

El topo work

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • el topo
    replied
    Terrestrial nocturnal telescope

    Leave a comment:


  • el topo
    replied
    Astronomical clock

    Leave a comment:


  • el topo
    replied
    Space-time distortion 2

    Leave a comment:


  • el topo
    replied
    3 GW plant with liquid rocket engines

    Leave a comment:


  • el topo
    replied
    Aluminothermic crucibles

    Leave a comment:


  • el topo
    replied
    spectrum generator

    Leave a comment:


  • el topo
    replied
    Giant majorana-malgarini machine:

    https://disclosure2020.forumcommunit...896905#newpost

    Leave a comment:


  • el topo
    replied
    Space-time distortion

    Leave a comment:


  • el topo
    replied
    Pascal compressor 2

    Leave a comment:


  • el topo
    replied
    Pascal compressor

    Leave a comment:


  • el topo
    replied
    Create light from lunar vacuum

    Leave a comment:


  • el topo
    replied
    this

    Leave a comment:


  • el topo
    replied
    With 4 drones you can operate a 1 MW alternator which costs 2,000 euros for the Chinese. So with a total cost of about 4,000 euros you can have a 1 Megawatt plant ....

    Leave a comment:


  • el topo
    replied
    100 kw plant, 2.000 euros

    Leave a comment:


  • el topo
    replied
    Conical solar reflector

    Leave a comment:

Working...
X